Thesis
Saronic is building vertically integrated production of unmanned vessels at a time when the US Navy has an acknowledged shipbuilding shortfall. Its differentiation is throughput rather than any single hull: a $392 million Navy production contract for Corsair in 2025, a Louisiana shipyard with a $300 million, 300,000 sq ft expansion and the planned Port Alpha yard, which the CEO describes as about ten times Franklin's capacity.
The full memo on Saronic is being written.
Twelve sections: product, market, competition, funding, European angle, opportunities and risks. We publish each memo once every figure is verified.